news_top_banner

Leton Power Energizes Mexico’s Retail Giant: 227 Stores, Zero Grid Dependency

Introduction: Conquering Mexico’s Energy Volatility
In a nation where grid instability costs businesses $17.8B yearly, Mexico’s largest electronics retailer, Elektra, faced recurring operational disruptions. Partnering with Grupo Dragon—Mexico’s top energy solutions provider 24—Elektra sought a turnkey power resilience plan. Leton Power answered the call with 227 tailored generator installations, transforming vulnerability into unwavering reliability.

Adapting to Extreme Conditions

  • Environmental Hurdles:
    • High-altitude sites (2,500+ meters) requiring turbocharged combustion optimization.
    • Coastal humidity (>80%) risking corrosion on critical components 4.
  • Logistical Complexity:
    • Simultaneous deployment across 12 Mexican states within 6 months.

Leton Power’s Localized Approach

  1. Generator Customization:
    • 2000kVA units with Himalayan-Grade™ turbochargers maintaining performance at 3,000m altitude.
    • Nano-ceramic coated enclosures resisting salt spray corrosion (ISO 9227 certified).
  2. Fuel Intelligence:
    • Dual-tank system enabling switch between diesel/biodiesel, cutting CO₂ by 25% 4.
  3. Local Empowerment:
    • Trained 50+ Grupo Dragon technicians via Leton Academy in Monterrey.

Outcomes: Beyond Business Continuity

  • 100% Uptime: During 2024 grid blackouts affecting 23 states.
  • Sustainability Impact: 3,340 tons of CO₂ reduction annually—equivalent to 7,500 trees planted 4.
  • Economic Ripple Effect: Enabled Elektra to extend operating hours, boosting revenue by 8.3%.

“Leton’s generators performed flawlessly in Chihuahua’s deserts and Cancún’s tropics—a first for any supplier we’ve used.”
— Francisco Hernández, CEO, Grupo Dragon

Leton Power’s Mexico Advantage

  • ⚙️ Localized Inventory: Spare parts stocked in Guadalajara, Monterrey, and Mérida.

  • Post time: Jun-06-2025