news_top_banner

Need a Tailored Power Solution? LETON POWER Has You Covered!

Every business has unique power requirements. Whether it’s prime power for remote sites, standby backup for emergencies, or specific voltage/frequency needs, LETON POWER specializes in custom diesel generator solutions.

Leveraging our expertise and partnerships with Cummins, Perkins, and Isuzu, we design and deliver generators that fit YOUR exact needs.

Don’t settle for off-the-shelf. Get a solution built for YOU.

The Emergency Request
In April 2022, Siemens Energy approached Letonpower with:

  • Requirement: 72 medical-grade generators across 9 countries
  • Deadline: 60 days (vs. standard 150-day lead time)
  • Specifications:
    • ≤60 dB(A) at 7m (EN ISO 3744)
    • 0.005% THD (total harmonic distortion)
    • Dual-fuel capability (diesel + natural gas)

Letonpower’s Response
*Phase 1: Rapid Prototyping (Week 1-2)*

  • Converted existing LP-6500 industrial model
  • Implemented 3 critical modifications:
    1. 6-layer sound insulation (62dB → 57dB)
    2. EMI shielding for MRI compatibility
    3. Automatic fuel purge system for gas switching

*Phase 2: Production Scaling (Week 3-6)*

  • Activated “Priority Manufacturing Protocol”:
    • 24/3 shifts with 15% overtime premium
    • Air freight for critical components (Germany↔China)
  • Quality assurance:
    • 100% burn-in testing (72hrs continuous)
    • 3rd-party verification by TÜV SÜD

Technical Breakthroughs

  1. Silent Operation
  • Patent-pending LP-SilentCore™ technology
  • Comparative noise levels:
    • Baseline: 68 dB(A)
    • After modification: 57 dB(A)
    • EU requirement: 60 dB(A)
  1. Fuel Efficiency
  • 14.3 L/hr at 75% load (industry average: 16.8 L/hr)
  • Achieved through:
    • High-pressure common rail injection
    • Turbocharger wastegate optimization

Deployment Timeline

Week Milestone Locations Completed
7 First 12 units shipped Berlin, Stockholm
8 28 units cleared customs Paris, Milan
9 Final installation & staff training Athens, Lisbon

Post-Implementation Results

  • 100% compliance with EU Medical Device Regulation 2017/745
  • 63% energy cost savings for hospitals vs. previous systems
  • Zero critical failure incidents in 18 months of operation

Siemens Project Post-Mortem
“Letonpower didn’t just meet specifications – they redefined our expectations. Their ability to compress 6-month R&D cycles into 53 days has led to an ongoing partnership on 14 additional projects.”
– Dr. Elena Müller, Head of Critical Infrastructure, Siemens Healthineers

✉️ Ready for Reliable, Custom Power?


Post time: May-30-2025